国产热RE99久久6国产精品首页,四川少妇搡BBW搡BBBB,日韩 另类 综合 自拍 亚洲,4hu44四虎www在线影院麻豆

Service hotline:
0315-5913666(domestic)+1-304-960-1190(abroad)
Domestic > The Third Coal Preparation Plant of Datuhe Coking Company
26大土河焦化公司第三選煤廠.jpg
  • 26大土河焦化公司第三選煤廠.jpg

The Third Coal Preparation Plant of Datuhe Coking Company

Type: Coking coal preparation plant

Scale: 2.50Mt/a

Contracting mode: partial contracting, new construction projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, the fine coal slurry is sorted by the flotation machine, the flotation clean coal is dehydrated and recovered by the pressure filter, and the flotation tail coal is concentrated by a two-stage concentration process. After the tail coal slurry water is concentrated by the thickener, it is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a pressure filter combined with a closed loop washing water cycle, which is environmentally friendly and energy-saving.


在线人成视频播放午夜福利| 日本亲子乱子伦XXXX50路| 精品无码久久久久久尤物| 国产国产精品人在线视| 特级毛片A级毛片高清视频| 国产香蕉尹人综合在线观看|